Friday, April 16, 2010

How Much Developer To Mix With Hair Dye

is ready to visit the Wooden building


This is the 8m long Southeast facade on the upper floor. The untreated larch facade like it more and more :-)


Accurate and speedy work is needed here.

One of the many roof panel filled with insulation mats.



In the background is the ridge of the roof is not completed with mattresses. The windows are not only huge, it is also great :-) 1.50mx1.50m


cross in the hall just 9.5m long, the western counterpart edited.



wait out the final elements to be transported to Lyssach.




0 comments:

Post a Comment